Modernization of Railway Infrastructure to Increase Train Speed – Catenary and Power Supply Design

CHR has entered into a subcontract agreement with Alstom Transport SA to contribute to the design phase of the “Modernization of Railway Infrastructure to Increase the Speed of Train Movement: Construction” project in Latvia.

  • Total line length: over 100 km of track
  • Over 1,200 standalone OCL masts and foundations
  • Over 60 rigid OCL portals
  • Over 1,800 OCL cantilevers
  • Over 121 km of OCL wires
  • Over 22 OCL disconnectors