Another big milestone for the design team, the extension of berth Nr.2 in Skulte has been commissioned at the end of February 2024.
While facing difficulties with increasing wave height in river Age, narrow channel limitations as well as close proximity to existing CO2 terminal, our team of engineers came up with complex design solutions to tackle all of these problems simultaneously.
- Total length of berth extension – 150m
- Total length of 9m high dust control wall – 123m
- Total volume of soil dredged – 17000m3