Design Works for the Construction of Cable Duct Infrastructure

Client: Freeport of Ventspils Authority
Start date: May 2025
Completion date: November 2025

 

Following the award of the contract in the procurement procedure organized by the Ventspils Freeport Authority titled “Construction Design Documentation preparation for the Project ‘Cable Duct Infrastructure deployment from 14 K. Valdemāra Street, Ventspils Freeport Captain Building, to the Radar tower at 5 Dienvidu Mole, Ventspils’”, SIA “CHR Design Solutions” sucsessfuly completed all design works and got necessary applrovals from all responsible authorities.
As part of the construction design documentation, the following parts were developed:
  • EST – Electronic Communications Networks part;
  • DOP – Work Organization Project.
During the contract execution, SIA “CHR Design Solutions” team has completed the following design works scope:
  • cable duct infrastructure using a trenchless method – 0 m;
  • cable duct infrastructure using an open trench method – 0 m;
  • total length of cable duct infrastructure – 0 m;
  • total length of fiber optic cable – 0 m.