Liepāja Port Pier No. 46 – Minimum Composition design and Detailed Construction Design

CHR has been engaged as the main designer for the “Reconstruction of Liepāja Port Pier No. 46” project. Over the next six months, our team will prepare both a minimum composition design and a detailed construction design to support the project’s construction phase.

Scope of CHR’s Design Work
As the main contractor, CHR is responsible for the full design process, including:

  • Geotechnical Surveys
  • Hydrotechnical Design​
  • Ship Turn-Around Circle Calculations
  • Architectural 3D Visualization
  • MEP and Utilities Design