CHR has been engaged as the main designer for the “Reconstruction of Liepāja Port Pier No. 46” project. Over the next six months, our team will prepare both a minimum composition design and a detailed construction design to support the project’s construction phase.
Scope of CHR’s Design Work
As the main contractor, CHR is responsible for the full design process, including:
- Geotechnical Surveys
- Hydrotechnical Design
- Ship Turn-Around Circle Calculations
- Architectural 3D Visualization
- MEP and Utilities Design