Reconstruction of the Northern Breakwater at Engure Port and Construction of the Coastal Fishermen’s Berth

Client: Engure Port Authority
Start date: December 2024
Completion date: October 2025

 

SIA “CHR Design Solutions” has developed and coordinated construction designs in the minimum required scope for the projects “Reconstruction of the Northern Breakwater at Engure Port” and “Construction of the Coastal Fishermen’s Berth (Engure Port).”
To promote the development of coastal infrastructure in Engure, CHR provided detailed engineering and construction solutions within the project framework. As part of the reconstruction of the Northern Breakwater at Engure Port, the CHR team prepared the necessary graphical and textual documentation for the conceptual design, defining the main parameters, configuration, and intended use of the structure, as well as providing justification for the issuance of a construction permit.
Similarly, within the construction of the Coastal Fishermen’s Berth, graphical and textual documentation was prepared defining the main dimensions, location, and intended use of the berth, thereby providing justification for the issuance of a construction permit.
The implementation of the project will contribute to the modernization and sustainable development of Engure Port infrastructure, improving operational conditions for fishermen and other port users.

 